What to check before the soft starter is powered on?

2023-05-20 11:27:04

Soft starter is a novel motor control device that integrates motor soft start, soft stop, light load energy saving and multiple protection functions. It is called Soft Starter abroad. The domestic soft starter is the most famous Heping hps2 series soft starter. Its main composition is a three-phase parallel thyristor and its electronic control circuit connected in series between the power supply and the controlled motor.


The soft starter we use needs to be powered on. Generally, we need to check before power on before use. Let's take a look with the editors below to see which ones to check:


First, check the wiring


1. Check whether the wiring is correctly connected in accordance with the requirements of the product instruction manual, especially pay attention not to connect the output terminals (U, V, W) to the three-phase power supply.


2. Check whether the installation is normal and whether the grounding is correct and reliable. Especially for the control circuit wiring (such as the given signal line and feedback signal line on the input side, the frequency signal line and current signal line on the output side, the switch signal control line, etc.), it is necessary to keep away from the main circuit (more than 100mm) and shield Anti-interference measures. The shield of the cable should be connected to the common end (COM) of the control circuit near the inverter. Do not connect to the ground (PE) of the inverter. The other end of the shield should be suspended.


3. Check whether the brake unit wiring is correct. When connecting an external braking resistor (some inverters have a built-in braking resistor, when the capacity is insufficient, an external braking resistor is required), first remove the wiring of the built-in braking resistor from the P (+) and DBd terminals, and The wire end is insulated, and then the external braking resistor is connected to P (+) and DB. It is required that the wiring length is less than 5M, and twisted pairs are used.


4. Check whether the DC reactor wiring is correct. Note: Short-circuit conductors are connected to the connection terminals P1 and P (+) when leaving the factory. When using a DC reactor, this short-circuit conductor should be removed; if a DC reactor is not used, the short-circuit conductor can be connected at both ends of the reactor.


2. Check AC power. For three-phase inverters, the three-phase AC power supply voltage should be within the allowable range (such as 340-440v). Overvoltage and undervoltage are strictly prohibited.


Third, check the motor


1. Use a 500V-1000V megohmmeter to measure the insulation resistance of the motor winding to the shell, which should not be less than 5 megohms. If the insulation resistance is less than 2 megohms or the winding has been in contact with the shell, it is strictly prohibited to use the inverter. Otherwise, the inverter will be damaged.


2. Measure the DC resistance between the three windings of the motor, which should be balanced in three phases, and the resistance between the windings of each phase is ohms. If the resistance is too small or zero, it means that there is a short circuit in the motor winding, and it is strictly forbidden to use it.


In general, when we check the power of the soft starter, we also need to pay attention to the above points to reduce failures due to power problems during use.


通用變頻器


label

QR code

The public,

Mobile station
The public, Mobile station

Contact

未標題-8.png 0755-81719517
未標題-10.png0755-81719530 未標題-11.pngamb@ambition.com.cn
未標題-12.pngFloor 1, 5 and 6, building 7, lijincheng science and technology industrial park, gongye dong road, longhua new district, shenzhen

Navigation

Home          About

Product      Case

Solution      Service

Job      News

Contact          

Copyright © Shenzhen Ambition Electronic Co., Ltd Record number:備案號:粵ICP備12045920號
主站蜘蛛池模板: 日韩在线不卡一区在线观看| 国产精品九九热| 91精品国产闺蜜国产在线| 在线欧美视频| 青青草免费看| 亚洲国产精品自在在线观看| 欧美精品高清在线观看| 西瓜视频在线观看免费| 成人短视频在线免费观看| 国产黄色毛片视频| 四虎看片| 精品国产日韩亚洲一区91| 国产99视频精品免视看7 | 久久国产亚洲精品| 日韩中文有码高清| 日韩在线视频线视频免费网站| 九九午夜| 精品理论片| 国产毛片久久国产| 电车里的日日液液| 欧美在线不卡视频| 国内外精品影视大全| 阿v视频在线观看免费播放| 久久亚洲综合中文字幕| 国产高清一| 精品国产亚洲一区二区在线3d| 久久毛片久久毛| www视频在线观看免费| 草草网| 高清国产精品久久| 一级毛片观看| 一区二区三区精品国产欧美| 99久久国产综合精品女不卡| 在线观看亚洲精品专区| 欧美精品国产日韩综合在线| 国产精品成人四虎免费视频| 精品一区精品二区| 国产成人精品18| 天天干天天日天天射天天操毛片| 欧美激情亚洲精品日韩1区2区| 免费特黄一级欧美大片在线看|